Upcoming Lane Closure on HWY 813 Bridge

A lane closure will be implemented on the Hwy 813 bridge over the Athabasca River in the Town of Athabasca to accommodate construction between May 1st and June 15th (tentative dates).  The maximum allowable width over the bridge and the highway approaching the bridge during this lane closure will be 3.5 m.  Any questions related to transporting farm equipment over the bridge can be directed to the Bridge Contractor, Mike Rozendaal, with Alberco Construction Ltd.

 

Mike Rozendaal, P.Eng.
Senior Project Manager
C: 780.267.5803  P: 780.459.7110
mrozendaal@alberco.com