Please note that maintenance work is planned for the C-Road (aka as Twp Rd 690) bridge crossing the Athabasca River. The maintenance is to commence Thursday, August 22nd and is anticipated to take 2-days, the bridge will be reduced to one lane.
Please watch for construction workers and equipment. Drive safely and follow all posted construction signs.